2013年10月30日星期三

Overview of the use of cleaning sieve

Wuhan, central grain depot using shaker model TQLZal80 × 200, this sieve type original common rice, noodle factory in liquidation phase after the procedure . As the

particularity of grain production , vibrating screen supplier in order to achieve satisfactory cleaning effect , in the selection and use of equipment to do the following:
Granary is now equipped with complete sets of equipment production operations are 50t / h, yield than rice, flour mill is much larger , and the larger impurity grain on the

market , the choice of such a sieve type, note that the best choice for screen surface width 1.8m sieve , sieve -type because the width of 1.8m is a dual inlet , to take full

advantage of oscillating screen screening

The effective width of the sieve surface processing , and 1.5m in width of the screen surface of screen type is a single inlet , the material layer is concentrated in the middle

of the screen surface , the screen surface itself is narrow , plus the problems, the flow can not meet 50t / h production requirements. The sieve -type light impurities

removal efficiency is higher, can better meet the production requirements ,

But pay attention to timely collection hopper cleaned , it is worth noting that boot with particular attention to light impurities auger rotates in correct direction ,

otherwise, once running reverse , causing blockage. ③ The sieve -type small miscellaneous cleaning effect is better, because the screen surface with a self-cleaning ball ,

clogging . However, the screen on the ropes,

Valley of other fibrous impurities to be very sensitive . If too many of these impurities , cleaning is not timely , it will live in a big mixed paste the screen surface , so

that the effective screen management area is reduced , causing some food grain exports flow to large complex , affecting equipment production and cleaning effect . Wuhan,

central grain depot in general use, a vehicle cargo

Shut down after it cleaned once , a long time such impurities , 20min non-stop on the machine easy clean up once .

First, the application areas:
 Cleaning sieve is mainly applied to grain feed processing, cleaning accessories cleaning, lumpy material dispersed, especially for use after the mixer as an insurance sieve .

 Second, an overview :
 Advanced level of impurity cleaning equipment . Its simple structure , small size , large output , wide application , good sealing performance . Helix angle with adjustable

playing board and cleaning brush , can be suitable for different impurity content of materials cleanup. Sliced ​​big screen cylinder and double door structure , so that operation

and maintenance

Quick and easy.
Third, it works :
 The aircraft in the material fed from the feed inlet screen cylinder , the playing board by rotating the impact and delivery role, so that the material in the agglomerate

material is broken up, and with the surface of a plate with a circular motion around the cylinder , the centrifugal force under the influence of the material is less than the

sieve sift quickly from the body lower discharge

Out of the machine, close the screen cylinder cleaning brush ready to hang on the sieve to remove material on the tube . Greater than sieve large miscellaneous transportation in

playing the role of the board under the direction of exports to the passage of large miscellaneous discharge.

Mobile corn cleaning sieve profile

Suitable for mobile cleaning sieve with a small granaries , preliminary cleaning for food , except food containing large miscellaneous , small complex, light impurities , is

conducive to grain storage .
Cleaning sieve is mainly applied to grain feed processing, cleaning accessories cleaning, lumpy material dispersed, especially for use after the mixer as an insurance sieve . It

has an advanced level of impurity crushing and screening plant cleaning equipment , simple structure , small size , large output , wide application , good sealing performance . Pick

Helix angle with adjustable playing board and cleaning brush , can be suitable for different impurity content of materials cleanup. Sliced ​​big screen cylinder and double door

structure , coal vibrating screen operation and maintenance simple and quick to make . The aircraft in the material fed from the feed inlet screen cylinder , the playing board by rotating the impact

and delivery role, so that the material in the knot GROUP

Material is broken up , and with the surface of a plate with a circular motion around the cylinder , the centrifugal force , the less rapid screening sieve material from the

lower part of the body from the plane, close to the screen cylinder cleaning brush ready to hang the material on the sieve drum sweep . Greater than sieve large miscellaneous

lost in the playing board

Send effect, to the passage of large complex exhaust outlet direction .

How to exclude conveyor deviation

1 Adjust the belt conveyor idlers bearing belt in the middle of the entire belt conveyor idlers deviation , adjust the position to adjust the deviation ; idlers in the

manufacture of both sides of the mounting holes are worked into holes for be adjusted. Specific adjustment method , which specific method is biased belt

Side , which side idlers forward direction toward Belt feeder the belt forward, backward , or the other side . Figure 1 shows the direction of the belt upward deviation is lower roller

group should be located at the left, the upper roller group moved to the right place .

2 Install aligning roller group aligning roller Pan feeder group has many types such as an intermediate shaft type , four -link , vertical roller type, etc. The principle is the use of

block or roller rotates in the direction in the horizontal plane lateral thrust block or generate the automatic belt adjustment belt deviation reaches to the heart of the

purpose . Generally lose the belt

Sending machine or when the total length of the shorter run-time two-way conveyor belt using this method is more reasonable, because the shorter belt conveyors easier deviation

and not easy to adjust . And long belt conveyor is best not to use this method , because self-aligning roller group life belt use would yield

Students have been affected.

3 Adjust the drive pulley and the driven pulley and bend pulley position adjustment bend pulley belt deviation adjustment is an important part . Because a belt conveyor with at

least two to five rollers, all the rollers must be perpendicular to the installation location of the longitudinal direction of the belt conveyor centerline , if the partial

Oblique inevitable deviation is too large . Adjustment Method and its group of similar idlers . For the head drum as the drum belt deviation to the right , the right of the

bearing should be moved forward , the belt deviation to the left of the drum , the left bearing housing should be moved forward , also the corresponding will

After the shift left or right side bearing housings after the shift. Rear roller adjustment method and the head drum opposite. Adjustment method. After repeated adjustments

until the belt transferred to an ideal location. Adjust the drive or bend pulley in the best pre -install its exact location .

4 tension belt tension adjustment at the adjustment at the conveyor belt deviation adjustment a very important part . Hammer at the upper two tensioning idler pulley in addition

to other than perpendicular to the longitudinal direction of the belt should be perpendicular to the vertical line of gravity , which is to ensure its axis horizontal centerline

. Use screw

Tensioning screw or hydraulic tensioning cylinders , the tensioning roller bearing should be accompanied by two pan to ensure that the longitudinal axis of the drum

perpendicular to the direction of the belt . Specific method of adjusting the belt deviation adjustment of the drum at similar .

Introduction grain cleaning sieve

Cleaning sieve for separating the grain particle size, shape and weight similar type impurities such as stones , mud , metal particles block , such as glass and cinder .

Separation of wet and dry methods are two types:

       The device has a specific gravity of dry stoner and gravity grading station . Stoner in the proportion of food complete crushing plant inside is evenly fed into an inclined reciprocating

perforated plate ( scale orifice plate or wire braid ) , and controllable by an airflow leaving the fluidized state by a semi suspension weight flow

Down side discharge.

        Typical equipment for washing the wet wheat dryer , washing by the spiral groove and the vertical drying parts. Than double roller crusher the major impurities in the washing tank

sedimentation speed , accumulate on the bottom by a small screw conveyor to send to the discharge port ; wheat grain were floating to the big screw conveyor drying section ,

Separated from the surface to remove the moisture. Heavier stones, mud , etc. due to the vibration of reciprocating perforated plate facing the upper end of the moving close by

poly- stone district discharge. The way to provide airflow suction and blowing categories. Gravity grading station working principle and structure and the specific gravity

stoner similar : first food

Food together with impurities divided into two parts by weight , and then were to be cleaned , can reduce the number of devices or cleaning behind the switch to a smaller device

.

2013年10月10日星期四

Shaker repair and maintenance

1 , shaker though without lubricants, still need to overhaul once a year , replace the liner, on two screen surface to be trimmed so on. To remove the check vibration motor and

to the motor bearing oil , if the bearing is mobile screening plant damaged , replace .
2 , screen grid should always removed periodically check the screen surface is broken or uneven , the crushing plant sieve is blocked and so on.
3, the proposal to create a bracket to hang hanging standby screen surface .
4 , always check the seal, found worn or defective should be replaced.
5 , check the screen grid clamping device class , if loose should be pressed .
6 , the class checks the feed tank connection is loose, if the gap is larger , causing the collision , cause the device to rupture.
7 , the class checks sieve supporting device , observe the hollow rubber mats without significant deformation or degumming , when the rubber pad is damaged or crushed when the

transition should also replace the two hollow rubber mat.

Sieve shaker cleaning tips

1 , before the start of the security check has removed plywood .
2, check all parts are securely locked :
A, check the screen grid on the screen surface is pressed .
B, check the rubber pad with sieve and coal crushing plant rack connections .
C, check the vibrating motor with sieve connections.
3, check the vibrating motor:
A, check the power supply voltage
B, check the vibrating motor coal screening machine interlock control devices.
C, remove the motor cover and check the relative phase angle of the segments are aligned , tighten the fastening screws the segments .
D, two motor mounting angle should be consistent.
4 , feeder
A, tighten the gate .
B, check the inlet and outlet hose connections are sealed , but not too tight , otherwise it will twist in the sieve body movement break .
5 , no-load test
A, test , the sieve with the rack may not have collision or other unusual sounds.
B, check the amplitude sieve for reciprocating linear motion may not have distorted and other irregularities .
C, 10-15 minutes after the operation , using the wrench to tighten the bolt by a drive mechanism .

Apron Feeder Zhenyuan Machinery

Apron Feeder Zhenyuan Machinery

2013年10月9日星期三

Drum sieve shaker and the advantage of the characteristics

The drum sieve shaker What are the advantages Features

Many people trommel feature is not very understanding , below please vibrating screen, vibrating screen professional Dry vibrating screen manufacturer explain to us :

First we look at the main features of shaker :

Mainly by the sieve shaker boxes, shakers , coal crusher suspension ( or supporting ) devices and electric motors and other components. Electric shaker

The V-belt drive , drive spindle rotation shaker , shaker on the uneven weight of the centrifugal force of inertia , the vibrating screen box . Changing the eccentric weight

exciter obtain different amplitudes.

Shaker main advantages:

1 . As strong vibration sieve box , reducing the material clogging the sieve , thus making a sieve with high screening efficiency and productivity.

2 . Simple structure, easy removable screen surface .

3 . Screening of electricity consumed per ton of material less .

What is a drum sieve and features:

Trommel drum is hexagonal , rack , funnel, reducer, motor into five parts . After crushing the stone into the drum , on the one hand with the rotation of the drum being screened

by the centrifugal force of rotation of the drum and jigging action of screening material . On the one hand large size of stone along the drum

The slope of the forward flow through various mesh sieve gradually being screened out . After screening out small stone falling into each funnel , then the labor movement by the

people rushed out of the finished product or gravity heap. Its structure is simple and reliable , smooth running, with a good seal , no pollution, low noise, fast changer ,

Fine grading , sorting a large proportion of high yield, sorting accuracy , low failure rate , easy maintenance , etc., especially suitable for use grading gravel yard . Trommel

fine workmanship , durable , steel to steel welding , funnel large volume of steel pick from. Funnel with five points

Do not discharge . Funnel spout with flange connections can be made to both sides or one side material , easy to transport or gravity pull , increase production , prevent

blocking material wear mesh, delay production .

Shaker screening process in the use of techniques

Recently, many customers to ask , shaker during use should pay attention to what issues, and there is no shaker tips. The following is a shaker techniques used , we believe it

will be helpful to you .
    1, check the screen grid on the stone screening machine surface is pressed .
2, check the rubber pad with sieve and rack connections .
3, check the vibrating motor with sieve connections.
4, check the vibrating motor:
5 , check the power supply voltage
6 , check the vibrating motor interlock control devices.
7 , before the start of the security Circular vibrating screen check has removed plywood .
8, check all parts are securely locked :
9 Remove the motor cover and check the relative phase angle of the segments are aligned , tighten the fastening screws the segments .
10 , two motor mounting angle should be consistent.
11 , feed means
12 , to tighten gate .
13 , check the inlet and outlet hose connections are sealed , but not too tight , otherwise it will twist in the sieve body movement break .
14 , no-load test
15 test , the sieve with the rack may not have collision or other unusual sounds.
16 , check the amplitude sieve for reciprocating linear motion may not have distorted and other irregularities .
17 , 10-15 minutes after the operation , using the wrench tightening bolts used the drive mechanism .
Through the use of these techniques vibrating screen , vibrating screen can extend the service life , reduce energy consumption, cost savings, so as to improve economic

efficiency.

2013年10月8日星期二

Shaker common problems and their solutions

        Shaker, now widely used in metallurgy , powder , medicine, building materials, chemical and other industries, low noise test sieves , sieving , over
Sample filtration efficiency , high precision . So shaker by the industry the majority of users . However, when the vibrating coal vibrating screen sieve process, we could
Shaker encounter some failures, if we can not simple failure to identify and deal with it will be quite affecting our efficiency , waste our
User time , so here we will provide customers shaker common failures and such failures solutions.
    We summarize the shaker in the course of common faults , mainly in the following four points:
    First : vibrating screen China Vibrating Screen normal working machine rotation slows down , vibrating screen bearing heating
    Second: the material flow motion abnormalities
    Third: sieve shaker poor quality of materials
    Fourth: shaker fails to start or small amplitude
    These four points are often confused users of the common faults , often shaker for users on our website or call the consultation , I
This situation were four solutions summarized as follows:
    First : Check the motor , if the motor is a problem, replace the motor
    Second: the replacement of electrical components
    Third : to ensure regular cleaning of bearings , replace the seals , check the labyrinth seal
    Fourth: If the proposed three has no effect , replace the bearings, mounted eccentric , eccentric wheel to adjust the original
    Fifth: adjustable screening machine feed
    Sixth: uniform operation , stable feeding
    These six recommendations for the four failures, basic can be troubleshooting.

Electromagnetic vibration feeder common faults and solutions

       When the electromagnetic vibration feeder feeding equipment in one, in the course inevitably encounter various problems .
   
Troubleshooting
    1 power, electromagnetic vibration feeder does not shake
    (2) the noise is relatively large, tune coal production line rectifier or regulator has no effect , or a violent crash
    3 electromagnetic vibration feeder amplitude is small, and not much feeding amount
    4 . Regulator does not work, or weak shock adjustment potentiometer
    5 impulse or clearance work, work is not smooth
    6 Although the production is normal, but the current is large
Analysis of the causes of common
    1 for the first failure , possibly caused by the following reasons : ( 1 ) . Fuse is broken or open circuited ; ( 2 ) . Coil wire shorted ; ( 3 ) . Joints are decapitated ,

SCR is not conducting .
    (2) For the second failure , may have stone feeding machine the following reasons: ( 1 ) . Main springs ( spring or coil spring) fracture ; ( 2 ) . Tank connection with the exciter fork bolts

loose or broken ; ( 3 ) . Gap is too small ; ( 4 ) . Any increase in the weight of the machine
    3 for the third failure , may have the following reasons: silo discharge port design is unreasonable, excessive pressure to bear feeding trough
    4 for the fourth failure , may have the following reasons: ( 1 ) . Rectifier breakdown ; ( 2 ) . Coil wrong polarity ; ( 3 ) . Gap is expected clogged ; ( 4 ) . Plate spring

gap is blocked.
    5 for the fifth failure , may have the following reasons : a coil wire.
    6 Article for failure , may have the following reasons: ( 1 ) . Gap is too large ; ( 2 ) . Line package heat.
Solutions to common problems
    1 for the first failure , the solution is as follows: ( 1 ) . Replace the fuse and coil ; ( 2 ) . A search , replace the coil ; ( 3 ) . Connect fittings, conduction

thyristor . Should check all lines , specific treatment .
    2 for the second fault , the solution is as follows: ( 1 ) . Replace the main spring , and re- tuning ; ( 2 ) . Replace and tighten the bolts ; ( 3 ) . Adjust the air gap

large ( 4 ) Recovery
Machine normal weight.
    3 for the third failure , the solution is as follows : Improved nesting site structure , changing the discharge opening chute tilt angle , eliminating positions pressure

effect .
    4 for the fourth failure , the solution is as follows: ( 1 ) . Replace rectifier ; ( 2 ) . Grafting coil ; ( 3 ) . Clear materials to ensure the air gap ; ( 4 ) . Improve

housing sealed to prevent debris falling .
    5 for the fifth failure , the solution is as follows : Fix wires , replace the coil .
    6 For the sixth failure , the solution is as follows : Adjust the air gap size.