2013年8月28日星期三

Precautions start shaker

Shaker before the start there are some considerations and maintenance work is indispensable :
1, check the rubber pad with sieve and rack connections .
2, check all parts are securely locked .
3, check the vibrating motor:
4, check the supply voltage shaker
5 , check the screen machinery grid on the banana screen surface is pressed .
6 , check the vibrating motor with sieve connections.
7 , check the vibrating motor interlock control devices.
8 Remove the motor cover and check the relative phase angle of the segments are aligned , tighten the fastening screws the segments .
9 , two motor mounting angle shall be consistent feed means , tightening the shutter .
10 , check the inlet and outlet hose connections are sealed , but not too tight , otherwise it will twist in the sieve body movement broke , no-load test .
11 , runs in, vibrating sieve body and chassis , etc. not to have collision or unusual sounds.
12 , check the amplitude sieve for reciprocating linear motion may not have distorted and other irregularities .
13 , 10-15 minutes after the operation , using the wrench tightening bolts used the drive mechanism .
Operators must develop good operating practices, in order to better reduce production costs and improve efficiency.

没有评论:

发表评论