Xinxiang City Zhenyuan Machinery Co., Ltd. Screening machine is mainly used in metallurgy, coal, building materials, electric power, chemical and food processing and many other industrial sectors, a large number of screening machinery for mineral processing industry is charged with grading, dehydration, mud and de-mediated arduous office. Our screening, sieving High efficiency, uniform fabric, compact structure, technological easy installation, maintenance is simple.
Semi-mobile crushing plant
2013年7月8日星期一
Shaker routine inspection and maintenance
One, carefully check each junction sieve machine fastening bolts loose. Continue to run if loose will cause the sieve machine damage.
2, from the vibration motor to switch wiring for wear, replace the cable to be used when vibration-resistant neoprene cable. Non-missing items running.
3, check the motor without any abnormal sound or heat phenomenon. Motor bearing part of the temperature limit than the ambient temperature 40 ° C, if not normal to add
oil (Shell love Manley, RL3 grease), or replace the bearings. Renovation of motor mechanic with expertise should be.
4, the screen is tensioned mesh is damaged, if damaged timely changer.
5, screen machine after each use must take internally clean.
Replacement sieve shaker:stone feeding machine
1 found damaged screen, you need to replace the screen, simply loosen the outer locking handle, you can remove the screen grid, took mesh frame, remove the rubber seals,
fastening bolts, loosen the screen frame fastening bolts to replace damaged screens.
2, and then put on the new network, according to reinstall 6.1 descending. Note: The network must be smooth solid, first locking the lower screen frame bolts, then tighten
the upper bolt, the outer two V-shaped groove bolts must be tightened.
Equipment maintenance:
1, equipment operation should always refuel, refueling twice a week, Note Shell love Manley, RL3 grease.coal vibrating screen
2, once every three months to conduct minor repairs and maintenance ,6-12 months to conduct a major overhaul, the overhaul should check the motor, all fasteners loose, open
vibrator cleaning check bearings, seals, badly worn should be replaced .
3, regular inspection cables (motor leads changed every three months)
订阅:
博文评论 (Atom)
没有评论:
发表评论